Owner
Rhode Island Department of Transportation
Contractor
S&R / PIHL JV
Designer
Commonwealth Engineers & Consultants, Inc
Our Role
McNary Bergeron & Associates developed and designed the erection plans, procedures, temporary works and heavy lifts for erection of the arches, as well as the upper structural steel works and precast deck panels.
Total Contract Value
$100 million
Timeline
Spring 2010 - Summer 2013
Construction Method and Specifications
McB and the Contractor developed an innovative arch "roll-in" scheme for Phase 2 & Phase 3 construction. Arches were assembled on a slide track to the south in an area of good access that did not interfere with traffic. Completed arches were then rolled laterally to the north, and jacked up vertically into final position.