Bridge 50
Akko, Israel
Project Description
Dual precast segment bridges in Akko, Israel. Bridges have a length of 650 meters, and are 2x11.4 meters wide. The 9 spans have a maximum span length of 78 meters.
Owner
Yefe Nof Transportation Infrastructure and Constructions Ltd.
Contractor
Solel Boneh
Designer
Ronen Brown
Our Role
McNary Bergeron is providing construction engineering services including geometry control, construction analysis, and integrated shop drawing templates. We also independently verified several aspects of the design.
Total Contract Value
$15 million
Timeline
2010 - 2013
Construction Method and Specifications
- Twin 15-span bridges
- Single box precast segmental
- Ground based crane erected balanced cantilever
- Overhead erection gantry
- 78m typical span length
- 11.4m deck width
Owner
Yefe Nof Transportation Infrastructure and Constructions Ltd.Contractor
Solel BonehDesigner
Ronen BrownOur Role
McNary Bergeron is providing construction engineering services including geometry control, construction analysis, and integrated shop drawing templates. We also independently verified several aspects of the design.Total Contract Value
$15 millionTimeline
2010 - 2013Construction Method and Specifications
- Twin 15-span bridges
- Single box precast segmental
- Ground based crane erected balanced cantilever
- Overhead erection gantry
- 78m typical span length
- 11.4m deck width