Folsom Bypass Bridge
Folsom, CA
Project Description
Completion of the Folsom Dam Bridge restored a much needed route for the city of Folsom, CA. The road over the dam was closed to public traffic after September 11, 2001, prompting the need for a new bridge over the American River.
Owner
US Army Corp of Engineers
Contractor
Kiewit Pacific Co.
Designer
CH2M-Hill/URS
Our Role
McNary Bergeron & Associates provided construction engineering services to Kiewit Pacific for the cast-in-place segmental bridge. These services included construction analysis, geometry control, and shop drawings for the 970 ft long structure.
Total Contract Value
$75 million
Timeline
January 2007 to December 2008
Construction Method and Specifications
Cast-in-place segmental bridge using form travelers