Owner
Israel National Roads Company, Ltd.
Contractor
Solel Boneh Ltd.
Designer
ZZZ Engineering, McNary Bergeron & Associates
Our Role
McNary Bergeron & Associates is partnered with Zachoot Engineering of Tel Aviv, Israel to design all of the segmental bridges as well as provide construction engineering services for the Rupin Interchange. These services include integrated segment shop drawings, construction analysis, step-by-step erection procedures, falsework design, and geometry control.
Total Contract Value
$30 million
Timeline
June 2006 to Mid 2009
Construction Method and Specifications
The bridges were built using an overhead launching gantry in balanced cantilever. Adjacent boxes were connected using a cast-in-place closure strip.