Owner
Connecticut Department of Transportation
Contractor
Balfour Beatty Construction
Designer
Parsons Brinckerhoff
Our Role
Construction Engineering including erection analysis of the structure, girder erection sequences and procedures, and design of erection equipment and temporary supports systems.
Total Contract Value
$80 million
Timeline
2001 - 2005
Construction Method and Specifications
Reinforced Deck on Steel Plate Girders, erected with land and water based cranes on temporary erection bents. The project length is 1,800', Eastbound Structure - 60' wide, Westbound Structure - 70' wide with 5 spans, averaging 360' long.