McNary Bergeron provided construction engineering services including geometry control, construction analysis, and integrated shop drawing templates. We also independently verified several aspects of the design.
Total Contract Value
$40 Million NIS
Timeline
June 2009-Mid 2010
Construction Method and Specifications
Twin 12-span bridges:
- Single box precast segmental
- Balanced cantilever
- Overhead erection gantry
- 50m typical span length
- 11m to 14m variable deck width
Owner
Israel National Roads Company, Ltd.Contractor
Ashtrom Engineering & ConstructionDesigner
YSS Consulting Engineers Ltd.Our Role
McNary Bergeron provided construction engineering services including geometry control, construction analysis, and integrated shop drawing templates. We also independently verified several aspects of the design.Total Contract Value
$40 Million NISTimeline
June 2009-Mid 2010Construction Method and Specifications
Twin 12-span bridges:- Single box precast segmental
- Balanced cantilever
- Overhead erection gantry
- 50m typical span length
- 11m to 14m variable deck width