Owner
El Dorado County Department of Transportation, a division of Caltrans
Contractor
Shimmick Construction
Designer
SYSTRA IBT in partnership with Quincy Engineering, Inc.
Our Role
MBJ provided engineering services including construction analysis, integrated shop drawings, geometry control systems, and erection manuals pre-construction and performed coordination of these services during in-progress accelerated bridge construction. MBJ also provided design and analysis for erection equipment and temporary works including falsework, rebar guying systems, closure engineering, and form traveler analysis.
Total Contract Value
$74M
Timeline
2022-2026
Construction Method and Specifications
The superstructure consists of 1,180’ of variable depth (12’-30’) post-tensioned concrete box girders. A cast-in-place balanced cantilever construction method is used with form travelers to cast 68 total segments. A 536’ main span peaks at 375’ above the river gorge below and spans 2 each 200’ hollow main piers on 60’x60’x9’ footings with CDIH piles in the mountain sides.