Owner
Metropolitan Transportation Authority (MTA)
Contractor
Tutor Perini Corporation (Contract CM007)
Designer
GEC (Parsons, STV, Parsons Brinckerhoff JV)
Our Role
McNary Bergeron was hired by Tutor Perini to perform a redesign of the Smoke Exhaust Plenum located at the top of the Terminal Caverns. The Exhaust Plenum is the main ventilation system in the caverns and is designed to mitigate smoke in the event of a fire. This value engineering redesign helped expedite the construction schedule of the plenum and lowered construction costs. The scope included design of the plenum components as well as erection procedures and lifting/handling frames for the assembled precast members.
Total Contract Value
$10.2 billion
Timeline
Total Project 2007 - 2023 CM007 Contract 2015 - 2023
Construction Method and Specifications
Modularized precast concrete components set with high capacity forklifts and specialized handling frames.