Owner
Utah Department of Transportation
Contractor
Kiewit
Designer
Parsons
Our Role
McNary Bergeron & Associates provided construction engineering services to the Self Propelled Modular Transporter (SPMT) contractor, including independent review of the plans & procedures, and coordination of the interface requirements between the temporary works and permanent structure. The Project involved erection of two (2) bridges utilizing SPMTs as part of Utah DOT's accelerated bridge construction program. The conventional concrete , two (2) span bridges were constructed in nearly their entirety off line and transported directly into position using SPMTs.
Total Contract Value
$172 million
Timeline
2009-2010
Construction Method and Specifications
191-ft long and 69-ft wide single-span bridge roll-in; 2,300-ton self-weight (longest and heaviest multi-girder spans moved with SPMTs in the US at the time)