Owner
Iowa DOT
Contractor
Lunda Construction
Designer
Modeski and Masters
Our Role
McB is providing construction engineering services to Lunda Construction. This includes arch analysis and erection procedures for the 775 ft. main span arches.
Total Contract Value
$1.2 billion
Timeline
2017 - 2021
Construction Method and Specifications
Basket handle arch built using barge-mounted cranes. Steel arch supported using cable stays, anchored on a temporary steel tower.