Owner
Maryland Transportation Authority
Contractor
American Bridge
Designer
MDTA
Our Role
McNary Bergeron & Associates provided construction engineering services including: Construction analysis for the replacement of the suspension span deck, as well as the through truss deck, erection plans & procedures, geometry control systems, integrated shop drawings for the precast deck units. development and design of lifting and handling systems, design of marine access system and trestle.
Total Contract Value
$60 million
Timeline
2005 - 2009
Construction Method and Specifications
The deck for the suspension bridge and through truss was replaced during night closures. Each deck panel was saw cut, then replaced with a new panel. Traffic was restored each morning.