Owner
Bridges to Prosperity
Contractor
McNary Bergeron, Flatiron
Designer
McNary Bergeron
Our Role
McNary Bergeron performed the design and was on the build team for this pedestrian bridge in Guatemala
Total Contract Value
<$50,000
Timeline
May 2010
Construction Method and Specifications
Tilt-up steel pylon, Wire rope suspension cable and hangers. Built using basic falsework and hand-tools using industry team and local labor.