Owner
Alberta Ministry of Transportation
Contractor
Flatiron Constructors Canada Ltd.
Designer
CH2MHILL
Our Role
McNary Bergeron & Associates provided a peer review of the superstructure incremental launching scheme. This included design checks of the superstructure, substructure, and temporary launching system components.
Total Contract Value
$127M CAD
Timeline
2009
Construction Method and Specifications
The bridge is 472 m long and consists of ten 3.0 m deep constant depth steel plate girders. The bridge was launched incrementally from a launching bed behind Abutment 2 over temporary rollers at each pier.