PROJECT HIGHLIGHTS: RIYADH METRO PROJECT

Our Role

Provided Construction Engineering services for an aerial guideway that has over 600 spans of single box, dual box, and station platforms. The guideway is built using 5 overhead launching gantries for span-by-span construction and two sets of mobile segment lifters for balanced cantilever construction. The 600+ spans range in width from 4.5 meters to 17 meters and have a maximum segment weight of 83 tonnes.

Construction Method and Specifications

Combination of span-by-span and balanced cantilever construction.

Owner

Kingdom of Saudi Arabia

Contractor

Bechtel Almabani, CCC, Siemens

Designer

AECOM

Timeline

2013 - 2016